Put in container basement with passive heating/cooling system (1/09).
Propane tank and shop heater installed (1/09).
Dec '08-Jan '09 Saw the West & North sides done.
In Jan. '09 got the small lath moved and the mill. In the first of Feb saw the big lathe arrive (Thanks Chuckles).
Pool Arrives at end of March '09.
E. walkway & SW apron poured 2nd of April.
The pool was wonderful this summer.
Car ports Interior walls and Patios coming soon.